Start date: As soon as possible
Duration of the project: About 3 months
Location: Boom, Ghent or Kortrijk
Preparation of the following documentation:
System / Subsystem Specifications (SSS)
Interface Requirement Specifications (IRS)
System / Subsystem Design Description (SSDD)
Interface Design Description
System / Subsystem Traceability Matrix (TM)
Subsystem Design Decision Register
Experience as a System Engineer
Knowledge of the standard J-STD-016 is a plus
Experience with railways and system engineering
Strong documentation skills
Ability to perform under pressure